New York Application Guidance GIGP
The following compose New York state’s required documentation guidance. The Feasibility Study is a written document that provides the basis and justification for design. The Feasibility Study must primarily address the green infrastructure (GI) practice(s), even if it is only a portion of a larger project. Existing Conditions Graphic (a plan of the existing project site) and Conceptual Site Plan (plan of the proposed project) and site photographs are required documents.
A WaterNow Alliance Initiative
Whether you have a project that needs support or are just dipping your toe in, our team of experts is here to help.